What do I need to do before installing the System Control Box Cover for a DVLED Display?

Answer: Before attaching the System Control Box Cover, connect the control box’s power cable to the control box cover's Power Button, and then install the cover with screws to complete the installation of the System Control Box.



Last modified: 2022 ápr.

Direct View LED Display Support

General Questions

Contact Us

Contact Us directly if you’re unable to get the answers and solutions for your ViewSonic products.