What is the Cabinet installation order of the DVLED Floor Stand configuration?

The Cabinet installation order varies from the Wall-mount configuration. Please follow the steps in the respective order for the Floor Stand configuration:

  1. Cabinet B moved to the left side of the floor stand bracket
  2. Ensured rear-cabinet mounting bracket is securely placed onto the top cross beam of the floor stand
  3. Ensured notches under the cabinet are fitted into the protrusions of the system control box
  4. Aligned the screw holes on the cabinet and the top cross beam, then secured with supplied screws
  5. Cabinet A installed on the left side of Cabinet B. Snapped Cabinet A into the pins of the system control box
  6. Hex wrench used to help align and ensure no tile-to-tile steps before engaging five locking bolts from Cabinets A and B
  7. Locked hooks on Cabinets A and B using ten hexagonal screws
  8. Cabinet C installed to right of Cabinet B
     (aligned, engaged locking bolts, locked hooks) 
  9. Cabinet D installed to right of Cabinet C
     (aligned, engaged locking bolts, locked hooks) 
  10. Cabinet E installed to right of Cabinet D
     (aligned, engaged locking bolts, locked hooks)


Please move on to install the LED Modules


For cabinet installation order of the wall-mount configuration, please click here.



Recommended Links

"How do I install a DVLED Display with a Floor Stand configuration?"

Last modified: 2022 Apr

Direct View LED Display Support

General Questions

Contact Us

Contact Us directly if you’re unable to get the answers and solutions for your ViewSonic products.