What are the Installation Tools required to install my DVLED Display?

The recommended tools (unless otherwise stated) needed to install a dvLED Display is as shown below:

  • Self-leveling laser level
  • Stud sensor/finder - multi-depth/material
  • (2) 8’ ladder
  • Anti-static gloves (required)
  • 3/8” hammer drill/driver
  • ¼” impact driver
  • Pilot point drill bit set for metal
  • Metric ball-end hex key set
  • Impact-ready bit set – Phillips and slotted #2 and #3
  • Impact-ready nut driver set ¼” to ½”
  • 4-vial torpedo levels – 12” and 2’ length
  • Steel step drill bit
  • Toggler drywall anchors – 3/16” diameter
  • Tapcon concrete anchors – ¼” drive x 1 ¾” or longer pending wall substrate
  • Steel lag screw – 5/16th drive x 1 ¾” or longer pending wall substrate
  • Shop vacuum
  • Moving blankets/pop-up work tables
  • Convertible hand truck/dolly
  • Pen/pencil/Sharpie
  • 25’ steel magnetic tape measure


最新修改: 2022 4月

小间距LED一体机 支持服务

General Questions

联系我们

如果您无法获得 ViewSonic 产品相关的解决方案,请直接与我们联系